Construction of Water Mega-reservoir Project PRPS 2 Package B ,Umslal

  • 52
  • 0
  • 0
  • Last update : 01-11-2016

Design Consultant: Hyder Consulting Middle East Project Managemetn Consultant: Energoprojekt-Entel Ltd Client: Kahra- maa Main Contractor: HBK contracting WLL MEP Subcontractor Omega Engineering WLL Expected Completion date: March 2018 Description: PRPS2 Package B Um salal, is one of the five Mega reservoirs that are being built in Qatar for meeting the increasing water demand. It consists of 8 Reservoirs (3 future) of capacity 5,40 ,000 Cub.m each. All the mega-reservoirs are interconnected with large diameter pipelines. Omega Engineering WLL, as MEP subcontractor is carrying out the MEP works(non process) for the Reservoirs and the associated buildings.(34 Nos), Viz. Main Pumping station, Auxiliary pumping station, Utility Pumping station, Maintenance cleaners building, MV&Generator building, Chlorination buildings, Guard houses, Substations, Bulk fuel tanks etc.. Scope of Work: Complete Supply, Installation, testing and commissioning of 11 KV generators, LV Generators, VFDs, Synchronisation Panels, 11 KV switchgears, Transformers, LV switchgears, MCC Panels, Feeder pillars, Capacitor banks, MDB,SMDB,DB, Emergency Lighting system, Lighting control system, Central Battery system, Luminaires and lamps, Air cooled chillies, chilled water pumps, AHUs ,FCUs, CRAC units, HVAC Fans , VRF units, Package units and DX units, Chilled Water Piping , Ducting, Water Supply and Drainage etc. Subcontract work: Complete 11 KV installations work by KM approved subcontractor Complete Fire Fighting, Fire suppression and fire alarm system by KM approved subcontractor. Role: MEP project Manager Leading a team of peak manpower 250- 300.

This project has no media ...

Join or Log In to comment.

Abdul Salam
Abdul Salam Other, Qatar
  • Connect